![]() The supply and demand imbalance created high costs in both materials and labor, as well as long, costly lead times. Additionally, subs and contractors have to deal with the same lack of housing as everyone else. The exponential increase in activity also put a strain on the available labor market resulting in the majority of labor and trades having to come from outside of the region. Add to that the increase in annual construction volume as measured in building permit valuation from $10 - $20 million in 2002 to 2005 in Williston to a range of $40 - $470 million since then and you can imagine the strain on materials sourcing. Builders face a variety of challenges in the Williston Basin from the high cost of and access to construction materials and labour, but a New Zealand-based company hopes to provide an innovative light gauge steel solution to address those needs globally.īecause of the historically small volume of construction in the region and the long distance from urban centers such as Minot, Bismarck, Fargo and Billings, Montana, the quantity and scale of building materials suppliers in western North Dakota is small and the transportation costs for material delivery is high.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |